Laserfiche WebLink
r""'1 `17` 7--1 I*= (-"—I <br /> CU D <br /> oCollege Park at Mountain Hotise Specific Plan III <br /> CD <br /> Mitigation Monitoring and Reporting Program <br /> a Implementation&Vedrication <br /> c7 m Implementation <br /> oMitigation Measure TiminglSchedule Responsibility Action Date <br /> c Completed <br /> conducted to investigate all potential nesting <br /> 3 <br /> trees on the project site(e.g.,especially tree-tops <br /> 15-59 feet above the ground in oak,willow, <br /> ro eucalyptus,cottonwood,or other deciduous <br /> -C trees), whenever white-tailed kites are noted on- <br /> 2. site or within the vicinity of the site during the <br /> n nesting season.A setback of 100 feet from white- <br /> tailed kite nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and. <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> CO the nesting season in the presence-of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project construction begins <br /> during the nesting season(February 15--August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> o activity,The survey shall be conducted within <br /> 0 the Z weeks before construction begins.A <br /> setback of 500 feet from northern harrier nesting <br /> areas shall be established and maintained during <br /> athe nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> iD leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> 00 must begin during the nesting season in the <br /> _0 presence of nests that are known to be occupied. <br /> CO 0 Setbacks shall be.marked by brightly colored <br /> E3 � temporary fencing, <br /> < Common Raptors.If project construction begins <br />