My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K a <br /> �. n <br /> = * College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation <br /> Implementation Verification <br /> Responsibility Action Date. <br /> m <br /> Tcompleted <br /> during the nesting season(February 15 August <br /> 31),pre-construction surveys shall be conducted <br /> $ during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity.The survey shall be conducted within <br /> c <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are found,a setback of <br /> 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> CD ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to.construction <br /> under the SJMSCP, and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP applieation'process, <br /> SJCOG will determine whether that specific project <br /> c site supports suitable habitat for loggerhead shrike, <br /> Cn <br /> California horned lark,or tricolored blackbird.If <br /> CD <br /> C_ (n SJCOG determines suitable habitat is present on or <br /> roadjacent to a given project site,the following <br /> SJMSCP incidental take avoidance and minimization <br /> 0 -0measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> Loggerhead Shrike.If project construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.