Laserfiche WebLink
- -'t„�� l� ;.�1 � ,�.__1 e...,-�A �,�-i �,,,1 � 1�.......:1 r�;! i.�..1 'i..-�,_� ,.�..�1 �t. �.J it,�.J •�.-�-� �:---..a <br /> f/7 n <br /> v D <br /> D <br /> DCollege Park at Mountain House Specific PIan M <br /> Mitigation Monitoring and Reporting Prograin <br /> oImplementation Implementation&Veiification <br /> Mitigation Measure Timing/Schedule Date <br /> D Responsibility Acton <br /> . Completed <br /> 7• begins during the nesting season(April 1-August <br /> a 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> ro habitat within 100 feet of areas of project <br /> activity.The survey shall be conducted within <br /> CD <br /> the 2 weeks before construction or tree removal <br /> n <br /> � begins,A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins.during <br /> the nesting season(April I-August 31),pre- <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity.A <br /> setback of 500 feet from California homed lark <br /> • and tricolored blackbird nesting areas.shall be <br /> established and maintained during the nesting <br /> aseason for the period encompassing nest building <br /> W and continuing until fledglings leave nests.This <br /> CD <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> M are known to be occupied. Setbacks shall be <br /> o marked by brightly colored temporary fencing: <br /> B 4.10-9 Biological Resources--•-Conversion of San Joaquin Before construction SJCOG; in <br /> I <br />