Laserfiche WebLink
fn C'1 <br /> m o <br /> College Park at Mountain House Specific Flan III <br /> Mitigation Monitoring and Reporting Program <br /> nm Implementation&V 116atlon <br /> Mitigation Measure Timing/Schedule Implementation pate <br /> 0 Responsibility Action <br /> Completed <br /> qualified biologist and DFG determine it would <br /> not be likely to adversely affect the nest. <br /> NMonitoring of the nest by a qualified biologist <br /> may be required if the activity has potential <br /> adversely affect the nest. <br /> CD <br /> San Joaquin Kit Fox Before construction SJCOG,in <br /> -D < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a completed no more USFWS and DFG' <br /> pre-construction survey for active.and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified . less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> n or construction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas.Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> Standardized.Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groun <br /> o Disturbance(USFWS 1999). <br /> < If no active dens are found during the surveys,a <br /> o letter report documenting the survey methodology <br /> o and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> d before the start of ground disturbance or <br /> CL construction activity,and no further mitigation <br /> @ shall be necessary. <br /> $ < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> determine its current use.If no activity is observe <br /> �a M during this period, the den shall be destroyed <br /> immediately to preclude subsequent use.If kit fox <br /> activity is observed,the den shall be monitored for <br />