Laserfiche WebLink
m <br /> cn' D <br /> College Park at Mountain House Specific Plan 1 <br /> Mitigation Monitoring and Reporting Program <br /> Implementation.&Verification <br /> o Mitigation Measure TiminglScheduie Implementation pate <br /> • Responsibility j Action Completed <br /> m <br /> at least 5 consecutive days from the time of the <br /> observation,to allow any kit fox occupying the <br /> o den to move to another location. If it is not a natal <br /> or pupping den,use of the den can be discouraged <br /> during this period by partially plugging its <br /> o entrance(s)with soil in such a manner that any <br /> animal can escape easily.The den may be <br /> destroyed when,in the judgment of a qualified <br /> biologist, it is no longer occupied by a kit fox or it <br /> is temporarily vacant.Methods for den destruction <br /> shall be in accordance-with USFWS <br /> recommendations. <br /> < Occupied natal or pupping dens shall not be <br /> destroyed until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS.A 250-foot buffer zone shall be <br /> o maintained around natal dens'until the biologist <br /> determines that the den has been.vacated. <br /> Additional provisions of the Standardized <br /> v Recommendations for Protection of the San <br /> Joaquin Kit Fox Before or During Ground <br /> ^ Disturbance(USFWS 1999),including those <br /> ofor educating construction workers regarding <br /> kit fox,keeping heavy equipment operating at <br /> safe speeds,and checking construction pipes <br /> for kit fox occupation during construction, <br /> Nshall also be implemented. <br /> cn <br /> o-a Jurisdictional Waters of the United States Before Construction SJCOG,in <br /> n < The College Park Developers shall implement coordination with <br /> Mitigation Measure,4.14-10. DFG,USACE and/or <br /> o RWQCB <br /> c � <br /> 3 4.11. TRAFFIC <br /> 4.11-1 Transportation—Effects on 2025 Cumulative Before construction San Joaquin County <br />