Laserfiche WebLink
cnn <br /> a) o <br /> CD College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Prograzn <br /> v fmpfementafior &Verification <br /> Mitigation Measure Timing/Schedule fmplementatfon <br /> Responsibility Action Co©plefed <br /> w <br /> 4.13. NOISE <br /> c4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the <br /> < Limit project construction activities to the hours developer <br /> between 6:00 a.m, and 9:00 p.m. <br /> < .Comply with the San Joaquin County <br /> -a Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment; <br /> fixed-or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> w installed around stationary equipment,if <br /> ' necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> Noise and during conjunction with the. <br /> �. The project applicants shall incorporate the measures construction developer <br /> m <br /> identified below into the project design. <br /> a <br /> Commercial,Office,and Industrial Uses <br /> Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> `0 exceedance of 55 dBA L,q during daytime hours <br /> om (7:00 a.m. to 10:00 p.m.)or 50 dBA L,q during <br /> nighttime hours(10:00 p.m. to 7A0 a.m.)at off--site <br /> noise-sensitive receptors.In addition,design and <br />