Laserfiche WebLink
r, rn <br /> oCollege Park at Mountain House Specific Plan IIh <br /> Mitigation Monitoring and Reporting Program <br /> o <br /> Implementation Implementation&Vedkdtiori <br /> 6 Mitigation Measure Timing/SchkUle Responsibility Action Date <br /> �n Completed <br /> a ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> cn particulate matter(PM)may occur and to review <br /> omethodologies that may become available to <br /> estimate the risk.The developers shall implement <br /> 3 any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality---Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College.Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse.piles are removed. <br /> CD <br /> Cn 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> a Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> RL the mitigation measures as recommended in the <br /> 9: Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> 2 are already included in the proposed project design <br /> and/or are already required by the MHMP and by <br /> Wo mitigation in the MHMP and Delta College EIRs. <br /> co <br /> L Cl) <br /> O a <br /> � n . <br /> C7 � <br /> o 5 <br /> c a <br /> �c .r <br /> 0 C:J © C-1 © © © E=3 ED E=3 �� ® © E=) E::3ED <br />