My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006256
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600433
>
SU0006256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:55:06 PM
Creation date
9/5/2019 10:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006256
PE
2620
FACILITY_NAME
PA-0600433
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600433\SU0006256\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 2.0 PROJFCT I3ESCRIPTION <br /> r <br /> The County Board of Supervisors adopted Mountain House Specific Plan II in February <br /> 2005. Shea Homes and Trimark Communities, LLC, propose to subdivide parcels and <br /> develop residential,commercial, and public/recreational uses within Neighborhoods C,H, 1, <br /> and T of Specific Flan IL Neighborhoods I and 3 are north of Byron.Road and Neighborhood <br /> H is just south of Byron Road. f <br /> The Board of Supervisors adopted Mountain House Specific Plan.III in November 2005. <br /> This is the third specific plan approved under the Mountain House Master Plan(MHMP). <br /> i The area of Specific Plan IIIincludesthe southern portion of the community, primarily <br /> south <br /> of Grant Line Road and north of I-205. Specific Plan 111,contains a mix of residential <br /> ' densities, commercial/office uses,limited industrial uses, elementary schools, neighborhood <br /> parks, a high school,and a college component to accommodate a community college. In <br /> addition, a 31.3-acre community park will be developed in the southwest portion of <br /> Neighborhood A/B. Open space corridors are planned along the major power and gas-line <br /> easements that extend through Mountain House. The Altamont Heights subdivision is a part <br /> of'Neighborhood A/B. <br /> PROJECT DESCRIPTION <br /> The project site is included in the Mountain House Master Plan(MHMP) and Specific Plan <br /> III, and was evaluated as a part of the environmental analysis that was conducted in 1994 <br /> (MEIR) and in 2005 (SPIIIEIR). The applicant/property owner, Golden State Investments 11, <br /> LP, is requesting approval of a Major Subdivision and a Development Agreement in <br /> accordance with the Master Plan and Specific.Plan III_ In addition to these submittals, the <br /> applicant is requesting Amendments to the General Plan, Master Plan, and Specific Plan III. <br /> The tentative map for the major subdivision includes the following information and plans: <br /> Street Lighting Plan <br /> Second Unit Plan <br /> Circulation and Transit Plan <br /> Site Landscape,Fencing&Wall Plan <br /> Street Landscape Plan <br /> The Tentative Map, Second Unit Plan, and the Circulation and Transit Plan are included at <br /> the end of this chapter as Figures 2-2 through 2-4. <br /> Tentative Map <br /> The tentative map depicted in Figure 2-2 shows the 12.7-acre site subdivided into 53 parcels <br /> ranging in size from 5,745 square feet to 13,452 square feet. Figure 2-3 identifies the six lots <br /> designated with second units. These lots are located in the northern portion of the project site <br /> around"A" and"B" Courts and range in size from 7,904 square feet to 11,813 square feet. <br /> Figure 2-4 illustrates the Circulation and Transit Plan. The project site will be served through <br /> two entry points off of"F" Street, which is accessed from Central Parkway. The interior <br /> streets all have sidewalks along:both sides of the street. A Class III bike route is provided <br /> 2-3 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.