Laserfiche WebLink
MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 2.4 PROJECT DESCRIPTION <br /> riparian corridor is evident in the aerialphoto in Figure 2-1. Project plans call for filling in <br /> the riparian corridor and piping the surface water through the property to Mountain House <br /> Creek, north of the project site. Retrieving the riparian corridor and the neighborhood entry <br /> at the intersection o.f"F" Street with the Delta College site-will require changes to the <br /> following tables,neaps and/or plans in the Master Plan and Specific Pian III documents_ <br /> Table 2-2 <br /> Master Plan and Specific Plan III <br /> ` Table and Map Changes <br /> Master Plan Specific Plan III <br /> Table 3.1. Land Use Summary 'Table 3-1: Land Use Summary by Neighborhood l <br /> i <br /> Table 3.2 Land Use by Neighborhood Table 3-2: Master Plan Land Use Designation in SPIII ' <br /> Figure 3.5: Master Plan Designations Figure 1-3: Master Plan Designations <br /> Figure 3.8: Master Plan Designations—South Area Figure 3-2: Land Use Map and Residential Buildout <br /> Figure 4.18: Community Entries Location Plan Figure 3-4: SP III Zoning Diagram <br /> Figure 7.1: Recreation and Open Space Plan Figure 4-1: Illustrative Concept Plan <br /> Figure 4-2: Landscape Framework Diagram <br /> Figure 4-19: Entries Location Plan <br /> Figure 7-1: Recreation and Open Space Plan <br /> PROJECT DETAILS <br /> Site Planning/Architecture <br /> With the exception of eliminating the riparian corridor,the tentative trap reflects a layout as <br /> dictated by policies in Specific Plan III. Architectural details or product types are unknown <br /> at this time. When individual building plans are submitted to San Joaquin County,the <br /> architectural themes and designs must comply with the Mountain House Community <br /> Services District(MHCSD)Design Manual (Pegasus Development, 2005)_ <br /> Landscaping <br /> The edges of the proposed project are defined by the landscape requirements as indicated in <br /> Specific Plan III and as shown in Figure 2-5 at the end of this chapter. Along the north and <br /> west side of the project site, the development is located adjacent to the Grant Line Village <br /> boundary. Due to the topography, the tentative map indicates that a retaining wall, varying in <br /> height from four to seven feet, would be installed along the north boundary of the site. A five <br /> foot maintenance easement will extend along the north side of the retaining wall. South of <br /> the retaining wall will be an eight-foot landscaped buffer and an agriculture fence. In the <br /> northwest corner of the project site,behind Lots 1 and Lots 52 and 53 will be an agriculture <br /> fence that will be located on the property line. A retaining wall four feet high or less would <br /> be installed along a portion of the southern boundary of the project site as well as a five-foot <br /> 2-5 <br />