Laserfiche WebLink
r r r r r— r— r r r r r r r r— r r= r— r r <br /> � o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o = Implementation Implementation 8 Verification <br /> ate— <br /> C Mitigation Measure Timing/Schedule <br /> a = Responsibility Action Completed <br /> retention in-lieu of the required expansion of WQB1, <br /> x before development of those portions of <br /> y Neighborhoods B and D to be served by the DeAnza <br /> CD Boulevard and Mountain House Parkway storm-drain <br /> systems. <br /> 4.8 WATER QUALITY <br /> M 4.8-1 Water Quality—Potential Temporary NOI(s)submitted to MHCSD, in <br /> Construction-Related Water Quality Effects the Central Valley conjunction with the <br /> The College Park developers shall consult with the RWQCB before developer, and in <br /> Central Valley Regional Water Quality Control Board beginning of coordination with the <br /> (RWQCB)to acquire the appropriate regulatory applicable ground- Central Valley <br /> approvals that may be necessary to obtain Section disturbing or RWQCB <br /> 401 water quality certification, ensure compliance dewatering activities; <br /> with the State Water Resources Control Board water quality <br /> (SWRCB) statewide National Pollutant Discharge performance <br /> Elimination System(NPDES) stormwater permit for standards established <br /> general construction activity and the Central Valley before construction <br /> RWQCB NPDES permit for construction dewatering begins <br /> a activity, and obtain any other necessary site-specific <br /> 0 WDRs or waivers issued pursuant to the Porter– <br /> Cologne Act.As required under the NPDES <br /> stotmwater permit for general construction activity, <br /> the project applicant shall prepare a Stormwater <br /> Pollution Prevention Plan(SWPPP)and any other <br /> necessary engineering plans and specifications for <br /> n pollution prevention and control.The SWPPP and <br /> m other appropriate plans shall: <br /> B < Identify and specify the use of erosion and <br /> sediment control Best Management Practices <br /> (BMPs),means of waste disposal, <br /> ,$ M implementation of approved local plans, non- <br /> stormwater management controls,permanent <br /> postconstruction BMPs,and inspection and <br />