Laserfiche WebLink
Km <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> nmaintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> 7B during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> -a < Specify BMP inspection protocols to ensure that <br /> n <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> oD measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> CD hazardous materials used for equipment <br /> aoperation and hazardous waste; <br /> < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> R subsequent site-development activities; <br /> x <br /> < Identify personnel training requirements and <br /> U) o procedures that will be used to ensure that <br /> Cworkers are aware of permit requirements and <br /> o rn proper installation and performance inspection <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> osupervisory duties related to implementation of <br /> d <br /> > >_ the SWPPP; and <br /> < Require all construction contractors to retain a <br /> I I I I I I I I I I I I I I I I I I I <br />