Laserfiche WebLink
Mo <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 2. Implementation Implementation&Verfication <br /> Mitigation Measure Timing/Schedule Responsibility Action Comaleted <br /> p <br /> aduring the nesting season(February 15—August <br /> x 31),pre-construction surveys shall be conducted <br /> CD during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity. The survey shall be conducted within <br /> v the 2 weeks before construction or tree removal <br /> n <br /> begins. If any active nests are found, a setback of <br /> B 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> No ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> CD Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> `D Loss of Active Nests conducted 2 weeks <br /> WThe College Park developers shall request coverage prior to construction <br /> a, under the SJMSCP,and fees shall be paid in the activities) <br /> 94 amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> o site supports suitable habitat for loggerhead shrike, <br /> m California homed lark,or tricolored blackbird. If <br /> o` Cn SJCOG determines suitable habitat is present on or <br /> a adjacent to a given project site, the following <br /> SJMSCP incidental take avoidance and minimization <br /> n v measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> ' = < Loggerhead Shrike.Ifproject construction <br /> I f I I I I I I I I I I I I I I I I I <br />