Laserfiche WebLink
r r r r I i r r— r r r- r r r— r r V-_ r F <br /> WOto <br /> WO <br /> CD College Park at Mountain House Specific Plan III <br /> �. ate, Mitigation Monitoring and Reporting Program <br /> 5 � <br /> W Implementation&Verification <br /> o <br /> c Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> �• begins during the nesting season(April 1—August <br /> 0 31),pre-construction surveys shall be conducted <br /> y during the nesting season in suitable nesting <br /> fD habitat within 100 feet of areas of project <br /> activity. The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins. A setback of 100 feet from loggerhead <br /> W shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins during <br /> the nesting season(April 1—August 31),pre- <br /> construction surveys shall be conducted during <br /> o' <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity. A <br /> —' setback of 500 feet from California homed lark <br /> 0 <br /> and tricolored blackbird nesting areas shall be <br /> `0 established and maintained during the nesting <br /> W <br /> CL season for the period encompassing nest building <br /> and continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> mo are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> B 4.t0A Biological Resources—Conversion of San Joaquin Before construction SJCOG, in <br />