Laserfiche WebLink
U_ r- r-- I r r r r r- r-_ U r- r- r- r- r! r- r-- r- <br /> Nn <br /> N O <br /> o <br /> College Park at Mountain House Specific Plan HI <br /> �c Mitigation Monitoring and Reporting Program <br /> o = Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule <br /> 3 o ResponsibilityAction Date <br /> Completed <br /> �• land uses, the operation of on-site landscape <br /> o maintenance equipment shall be limited to the <br /> y least noise-sensitive periods of the day,between <br /> CD the hours of 7:00 a.m. and 10:00 p.m. <br /> C <br /> 4.13-3 Noise—Increased Traffic Noise After construction SJCCDD,in <br /> The project applicants shall implement the measures conjunction with the <br /> identified below. developer <br /> < Before occupancy of the first residence at <br /> College Park,a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> Grant Line Road between Central Parkway and <br /> the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the EIR)and the northern travel lane of <br /> Grant Line Road.The noise barriers may consist <br /> of a wall, bemt,or combination thereof.The <br /> exact location, height,and character of the.noise <br /> barrier shall be determined by a noise consultant <br /> approved by the County. The sound barrier shall <br /> o reduce outdoor noise levels at the center of the <br /> ' front yards of the five existing residences to <br /> o below 65 dBA Ldn/CNEL.If Grant Line Road is <br /> g widened at this location subsequent to <br /> construction of the sound barrier but before <br /> d removal of the five residences under Specific <br /> a Plan II,the sound barrier shall be relocated,as <br /> CD <br /> required. If the five existing residences are <br /> $ removed under Specific Plan II before occupancy <br /> of the first residence under the College Park <br /> o project,this mitigation measure shall not require <br /> Mo implementation.This mitigation shall be funded <br /> through fair-share payments by the College Park <br /> developers. <br />