Laserfiche WebLink
Ko <br /> co' D <br /> o. College Park at Mountain House Specific Plan III <br /> = Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> �; Mitigation Measure Timing/Schedule Responsibility Action at <br /> Completed <br /> 0 4.134 Noise—Compatibility of Proposed Land Uses After construction SJCCDD, in <br /> exceeding Predicted Noise Levels conjunction with the <br /> CD <br /> -S The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> 0 <br /> the fust residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment. The noise barrier may consist of a wall, <br /> berm, or combination thereof. The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County. The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA Lm/CNEL and as close to 60 dBA <br /> m Ldo/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> m <br /> College Park developers. <br /> c <br /> _ <br /> iv <br /> 9' <br /> S <br /> N N <br /> _ (D <br /> O Cn <br /> a 2 <br /> c � <br /> = n <br /> 0 r <br /> p <br /> O <br /> C � <br />