Laserfiche WebLink
SPEC. PRIME CONSTR. CONTRACT - EXHIBIT A June 9, 1995 <br /> Pg. 7 of 7 <br /> ELECTRICAL (cont'd) <br /> D) Contractor will furnish labor and materials to mount Wet Stucco Control Panel supplied by <br /> Owner, to be mounted off second floor of silo structure in reach of the mixer platform, <br /> including: <br /> 1) Wiring run in conduit between new MCC and new control panel. <br /> 2) Wiring run in conduit between existing dry MCC and new control panel. <br /> 3) Wiring run in conduit from new control panel and existing dry MCC to all solenoid <br /> valves and limit switches shown on the G&Z P&ID Dwg. no. C-14747. <br /> 4) Wiring run in conduit between new control panel and Load Cell Summing Unit <br /> enclosure located on the ground floor near mixer load cells. <br /> 5) Wiring run in conduit between new control panel and remote Operator Control <br /> Station enclosure on ground floor at polymer pump location for unloading bulk <br /> trucks. <br /> E) Other miscellaneous Electrical to be installed by Contractor shall include: <br /> 1) Mount Load cell summing unit enclosure located on the ground floor near mixer load <br /> cells and run wire in conduit between enclosure and 4 ea. Load cells. <br /> 2) Mount remote Operator Control Station enclosure on ground floor at polymer pump <br /> location for unloading bulk trucks. <br /> F) Runs of conduit shall be on easiest and shortest run possible consistent with good <br /> workmanship and construction practices. <br /> G) Excluded from this contract is any County or City permits or utility fees. <br />