Laserfiche WebLink
SPEC. PRIME CONSTR. CONTRACT - EXHIBIT A June 9, 1995 <br /> Pg. 6 of 7 <br /> WATER SYSTEM <br /> Contractor shall furnish and install water system in accordance with the requirements of the San <br /> Joaquin County Code: <br /> A) Contractor will furnish labor to install water system as per G&Z P&ID Dwg. no. C-14747. <br /> B) Contractor will furnish pipe and fittings only as per drawings; all other parts, valves, <br /> regulators, etc. will be supplied by Owner. <br /> C) Pipe from the well to the tank shall be 2" schedule 40 galvanized and from the tank to the <br /> mixer, 3" sch. 80 PVC. No internal cleaning done, except air blowing. <br /> D) Water lines shall be on easiest and shortest run possible consistent with good workmanship <br /> and construction practices. <br /> ELECTRICAL <br /> Contractor shall furnish and install electrical in accordance with the requirements of the San Joaquin <br /> County Code: <br /> A) Run 440V power in conduit to new MCC. <br /> B) Contractor will furnish labor and materials to mount new Motor Control Center (MCC), <br /> (supplied by Contractor), with door-mounted disconnect and starters (or contactors where <br /> applicable) on the ground floor near the southwest column of the silo structure as shown in <br /> G&Z Dwg. no. D-14722 and run feeders in conduit to the following motors: <br /> 1 ea. - 60/30 Hp mixer (two speed) <br /> 1 ea. - 40/20 Hp mixer(two speed) <br /> 1 ea. - 15 Hp mixer <br /> 1 ea. - 1.5 Hp belt conveyor <br /> 1 t. y 4b Hp zsk tbaptabr <br /> 3 W 3A *dge X11 bVV' 1 ph ) <br /> 1 ea. - 1 Hp wall fan (I 15/230V, 1 phase) <br /> All above starters are full voltage, non-reversing, type 1B wiring, NEMA 1, 42 KAIC, with <br /> HMCP's. <br /> C) Lighting System, to include: <br /> iallttitRg �t tv!&littat 3he11 i1t1E 3 t� #1t�it'1ih1S . Lights shall be tied <br /> into existing lighting system and feeders to lights run in conduit. <br />