My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10182
>
2600 - Land Use Program
>
SA-94-45
>
SU0003012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:37 AM
Creation date
9/5/2019 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003012
PE
2633
FACILITY_NAME
SA-94-45
STREET_NUMBER
10182
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
10182 S HARLAN RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10182\SA-94-45\SU0003012\APPL.PDF \MIGRATIONS\H\HARLAN\10182\SA-94-45\SU0003012\CDD OK.PDF \MIGRATIONS\H\HARLAN\10182\SA-94-45\SU0003012\EH COND.PDF \MIGRATIONS\H\HARLAN\10182\SA-94-45\SU0003012\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FFFile <br /> No. 20-3821-01.G01 kn K L E I N F E L D E R <br /> January 6, 1995 <br /> REPORT <br /> GEOTECHNICAL INVESTIGATION <br /> VALLEY MATERIAL TRANSPORTATION FACILITY <br /> FRENCH CAMP, CALIFORNIA <br /> 1. INTRODUCTION <br /> This report presents the results of a geotechnical investigation performed for the proposed <br /> Valley Material Transportation facility to be located at 10182 South Harlan Road in French <br /> Camp, California. A plot plan and vicinity map showing the approximate location of the <br /> proposed facility are presented on Plate A-1. <br /> H. PROPOSED CONSTRUCTION <br /> The proposed facility will be constructed in the northeastern corner of the site. The entire site <br /> encompasses approximately 26.7 acres; however, only 12.7 acres will be developed as part of <br /> this facility. Another project will be constructed between Harlan Road and this facility. An <br /> access road extending east from Harlan Road to the subject property will also be constructed <br /> as part of the development for this project. In addition, a storm water retention basin will be <br /> constructed in the southeast portion of the site. <br /> n <br /> jWe understand that the proposed Valley Material Transportation facility will consist of an <br /> approximate 15,000 square-foot steel office building with a concrete slab-on-grade floor. <br /> Foundation loads are expected to be relatively light. Asphalt concrete parking pavement will <br /> _ surround the office and provide for employee parking. Shop access is expected by a concrete <br /> pavement apron. The majority of the site will be covered with gravel for truck parking. A <br /> septic system is proposed at the northwest corner of the project site. Additional details of the <br /> planned construction are not known to our firm at this time. <br /> ( III. PURPOSE AND SCOPE OF INVESTIGATION <br /> The purpose of our geotechnical investigation has been to explore and evaluate the surface and <br /> subsurface soil conditions at the site and to provide recommendations for use in design. The <br /> scope of our services was outlined in our discussions on October 13, 1994. Our services were <br /> 1 initiated with your verbal authorization. <br /> l� This report contains the following information: <br /> • Plot plan and vicinity map showing the approximate locations of the test borings <br /> drilled for this investigation <br /> • Logs of borings <br /> Copyright 1995 Kfainfcldcr, Inc. Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.