Laserfiche WebLink
Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-04-153 (SA) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$571.00 per 1,000 gross square <br /> foot of building designated as Office. The fee shall be automatically increased on January 1 of each year <br /> through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Applicant shall provide a written a statement to the Department of Public Works stating whether Surface <br /> Transportation Assistance Act type trucks will be used as a part of the proposed operations. If STAA <br /> type trucks are to be used, a letter requesting designation of the proposed facility as an STAA terminal <br /> will be required. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> r\rnnmmrrsys X mai An In,pd <br />