Laserfiche WebLink
e. <br /> a <br /> Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> MS-97-13 <br /> is required for processing per Development Title Table 9-240.2 in addition to a copy of the <br /> Grant Deed and an estimate. The estimate shall be prepared by a Registered Civil Engineer <br /> with a typical section drawing on a form to be supplied by the Department of Public Works and <br /> submitted to the Department of Public Works for approval. As an option,the Department of <br /> Public Works will prepare the drawing with estimate for an additional fee of$115.00.) <br /> (Development Title Section 9-1150.2(d)(3)) <br /> 4. All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910.20) <br /> 5. Any driveway that exceeds 150 feet in length from any public roadway shall be improved in <br /> accordance with the requirements of the Uniform Fire Code Section 10.207, San Joaquin County <br /> Standards F-1a, F-1b and F-lc and the Linden-Peters Fire District prior to issuance of the <br /> occupancy permit. (Development Title Sections 9-1145.5 and 9-1150.15) <br /> 6. Drainage from Parcels 2 and 3 shall be retained on-site and shall be noticed by a statement on the <br /> Parcel Map. <br /> (Development Title Section 9-113 5.9) <br /> RWH:ti <br /> PS-71008,12 <br /> E: Manuel Lopez, Deputy Director/Development <br />