Laserfiche WebLink
Use Permit Application No. was approved by the Planning Commission on . The <br /> effective date of approval is . This approval will expire on , which is 18 months from <br /> the effective date of approval, unless (1) all Conditions of Approval have been <br /> complied with, (2) all necessary building permits have been issued and remain in <br /> force, and (3) all necessary permits from other agencies have been issued and <br /> remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Jeff Fisher, 468-9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT". The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the "SITE PLAN CHECK <br /> LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a 400-person farm labor camp, as shown on <br /> the Plan dated September 17, 2001 and described in the application attachment by <br /> Aubrey Moore Architects dated September 24, 2001. (Use Type — Farm Labor <br /> Camp) <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License <br /> prior to the initiation of the use. The Business License may be applied for <br /> concurrently with the building permit application. (Section 7-1000 of the County <br /> Ordinance Code) <br /> d. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site <br /> Plan. Drainage. calculations prepared by a registered civil engineer or architect <br /> shall be included. (Development Title Section 9-1135) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintained with base material of appropriate depth and asphalt <br /> concrete or Portland cement concrete to provide a durable, dust free surface. <br /> Bumper guards shall be provided when necessary to protect adjacent structures <br /> or properties,(Development Title Section 9-1015.5[e]) <br /> (2) A minimum of 142 parking spaces shall be provided, including five (5) <br /> handicapped accessible spaces, one of which shall be van accessible. <br /> Accessible spaces shall be located as close as possible to the primary entrance <br /> (C.C.R., Title 24). (. 33 spaces are required for every bed-, One (1) space is <br /> required for every employee.) (Development Title Section 9-1015.3) <br /> I <br />