My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002246
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
16450
>
2600 - Land Use Program
>
UP-98-18
>
SU0002246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:08 AM
Creation date
9/5/2019 11:00:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002246
PE
2626
FACILITY_NAME
UP-98-18
STREET_NUMBER
16450
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
16450 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARNEY\16450\UP-98-18\SU0002246\APPL.PDF \MIGRATIONS\H\HARNEY\16450\UP-98-18\SU0002246\CDD OK.PDF \MIGRATIONS\H\HARNEY\16450\UP-98-18\SU0002246\EH COND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-98-18 <br /> 3. The entrance road shall be improved in accordance with the requirements of the <br /> Uniform Fire Code Section 10-207, San Joaquin County Standards F-1 a, F-1 b and F-1 c <br /> and the Linden-Peters Fire District prior to issuance of the occupancy permit. <br /> (Development Title Sections 9-1145.5 and 9-1150.15) <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $144.23 per <br /> daily trip-end generated in the Lockeford area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) (Resolutions R-00-433) <br /> 5. The developer shall install two (2) downgradient monitoring wells. A plan including well <br /> design, location and monitoring schedule shall be submitted for approval by the <br /> Department of Public Works Solid Waste Division. <br /> 6. Enclosures for storage of recyclable materials, which include plastics, glass, aluminum, <br /> cardboard and newspapers, shall be provided. (Ordinance No. 3756, Chapter 9-1160). <br /> 7. Spaces for recycling used tires prior to their disposal shall be required. <br /> 8. Area for recycling used oil shall be provided. (Grant funds for a used oil recycling j <br /> system may be available through the Department of Public Works Solid Waste Division <br /> at 468-3066.) <br /> 9. The developer shall conform to the San Joaquin County Waste Plan Format for <br /> Development Projects (attached). <br /> 10. The frontage improvements for Harney Lane shall be constructed in conformance with the <br /> standards for one-half of a 60-foot right-of-way for a Rural Collector along the parcel's <br /> frontage. <br /> GK:BN <br /> PS9E271.11 F <br /> Attachment <br /> c: Tom Gau, Deputy Director/Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.