Laserfiche WebLink
,AUBREY MOORE, JR <br /> 9-13-01 <br /> Page 3 <br /> Management. An onsite wastewater system Operation, Maintenance, and <br /> Management Agreement is recommended, and may be anticipated to be required by <br /> the RWOCB. The system should be provided with remote monitoring capabilities, with <br /> an autodialer, for all alarm conditions. <br /> I hope this preliminary discussion provided the planning information you need to present <br /> your project-at this time. Please feel free to call me with any questions. I look forward <br /> to working with you on the more detailed water and wastewater system designs, as the <br /> project develops. <br /> Sincerely, <br /> David Dauwalder, P.E. <br /> Principal ' <br /> Cc: DickiChambers, NK Engineering; via Fax: (530) 758-5560 <br /> I:Wcempol9-13-01 prelim-engin.doc <br /> TOTAL P.03 <br /> I <br />