Laserfiche WebLink
Table 2. Percolation Test Summary <br /> Test No., Percolation Percolation Test Duration Comments <br /> Date Tested Test Rate (see notes) <br /> Depth (ft.) (minutes/inch) <br /> P10 (Parcel 10) <br /> 2/13/13 7.35 31.25 4 hr. Test failed <br /> Deep Test <br /> P11 (Parcel 10) <br /> 4/19/13 3.27 62.5 4 hr. Test failed <br /> Shallow Test <br /> P11 (Parcel 10) Satisfactory <br /> 4/19/13 12.00 <2.6 4 hr. <br /> Deep Test perc. rate <br /> Note A satisfactory percolation rate for a "shallow" test is less than or equal to 60 minutes per inch. A satisfactory <br /> percolation rate for a "deep"test is less than or equal to 30 minutes per inch. <br /> Discussion of Percolation Test Results <br /> The soils within the percolation test areas of the Site have demonstrated satisfactory <br /> percolation rates for the use of standard septic systems in accordance with the <br /> requirements of the San Joaquin County Environmental Health Department. <br /> Discussion of Septic System Sizing <br /> Septic system construction utilizing leach lines and seepage pits should follow the San <br /> Joaquin County On-Site Wastewater Disposal Standards (2003) where applicable. <br /> LOGE 1217 Page 10 <br />