Laserfiche WebLink
HAZARDS <br /> 30. Protocols for Petroleum Hydrocarbons in soil: If indications of petroleum hydrocarbon <br /> contamination in site soil, such as staining and odors, are observed during excavation or <br /> grading activities adjacent to Byron Road, the contractor shall stop work and notify the <br /> Chevron Environmental Management Company and the RWQCB in accordance with the <br /> procedures specified in the Soil and Groundwater Management Plans for Chevron Mountain <br /> House Sites Nos. 1, 2, and 3. The contractor shall ensure that any contaminated soil and <br /> groundwater encountered during project construction is handled in a safe and lawful <br /> manner. <br /> 31. Hazardous Waste: Handling, use and storage of hazardous chemicals or materials <br /> including, but not limited to, asbestos shall be carried out in compliance with all applicable <br /> safety standards and coordinated County programs. Applicable standards shall be made <br /> part of the construction specifications for contractors. <br /> Timing: Inclusion of note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPII Implementation Measure 6.7 (1)] <br /> 32. Environmental Hazards: The applicant shall comply with all recommendations of the <br /> following applicable Environmental Site Assessment Reports prepared by Condor Earth <br /> Technologies, Inc., in 2004 and submitted with the Tentative Maps: <br /> a. Neighborhoods D, K, L, and Town Center Phase 1 Environmental Site Assessment <br /> Report and A Partial Response to Mountain House Master Plan Chapter Six, Mountain <br /> House, San Joaquin County, California. <br /> b. Limited Phase 11 Environmental Site Assessment Report, Proposed Neighborhoods D, K, <br /> L, and Town Center, Mountain House, San Joaquin County, California. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. <br /> 33. Pre-Construction Safeguards. Prior to any construction, appropriate plans, operating <br /> procedures and safeguards shall be undertaken to insure safety in the area of fuel lines and <br /> pipelines, consistent with the MHCSD Emergency Preparedness Plan (see Emergency <br /> Pipelines Safety Plan). [SPII Implementation Measure 6.8.1 (1)] <br /> BIOLOGICAL RESOURCES <br /> 34. Participation in HCP: The Tentative Maps shall comply with the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan(SJCMSCP), including all required take <br /> avoidance and pre-construction survey requirements. Alternatively, if the SJCMSCP <br /> terminates, the Tentative Maps may proceed with the implementation of the Mountain House <br /> Habitat Management Plan, contained within the Master Plan Appendix 7-13, pursuant to the <br /> terms of Section 3.11 of the Master Plan Development Agreement between San Joaquin <br /> County and Trimark Communities, LLC. [SPII Implementation Measure 7.3.1 (1)] <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD) prior to the issuance of grading <br /> permits for the project. <br /> Conditions of Approval -30- <br />