Laserfiche WebLink
18. Final Map Digital File: A digital file of the Final Map shall be submitted to the MHCSD and to <br /> the San Joaquin County Community Development Department. The digital file format shall <br /> be consistent with requirements of the County Assessor and Community Development <br /> Department GIS division and the MHCSD digital file format. Condition shall be met prior to <br /> approval of Final Map. <br /> 19. Geotechnical Report: All infrastructure designs shall be shown on the grading and <br /> improvement plans and shall comply with and incorporate the recommendations of the <br /> Geotechnical Engineering Studies. Condition shall be met before approval of Final Map. <br /> 20. Environmental Hazards: Comply with all recommendations of the Environmental Site <br /> Assessment prepared for the project. Condition shall be met prior to beginning any <br /> construction on the related Final Map. Annual Reports, if applicable shall be submitted to the <br /> MHCSD Development Director. <br /> 21. Monitoring Agreement: The developer shall fund its fair share of the Community Monitoring <br /> and Mitigation Monitoring Programs, including the annual Traffic Monitoring Report. The <br /> developer shall also fund the MHCSD's efforts to monitor compliance with the Tentative Map <br /> conditions of approval. <br /> 22. Agricultural Drainage Improvement Phasing A Surface and Subsurface Drainage Facilities <br /> Relocation and Improvement Plan shall be submitted to and approved by BBID and MHCSD <br /> Public Works Director. The plan shall include, but not be limited to, the following: <br /> • Phasing for relocation and improvement of existing surface and subsurface drainage <br /> facilities, as applicable. <br /> • Locations and timing of any applicable relocations; <br /> • Identification of"dewatering" areas and temporary or permanent methods for the <br /> dewatering system and connections to the storm water collection system, as <br /> determined necessary by the plan; <br /> • BBID Encroachment Permits. <br /> 23. The developer shall prepare an SB 221 report to address the community's potable water <br /> supply needs prior to filing of any of the project's Final Maps. <br /> 24. Library Services: This project is subject to the Mountain House Master Plan conditions for <br /> Construction of a library. Construction of the Library shall begin when approximately 4,500 <br /> residential units in the Mountain House Master Plan area have been permitted. The library <br /> shall be completed within eighteen months of commencement of construction, unless an <br /> extension is approved by the MHCSD General Manager. The Library shall be dedicated to <br /> the MHCSD upon satisfactory completion. This condition can be satisfied by an agreement <br /> acceptable to the MHCSD that the required facilities will be constructed on this schedule and <br /> if they are bonded for. <br /> 25. Fire Station: Prior to filing of the final map the second fire station shall be either constructed <br /> or, if approved by the General Manager, bonded for or, if determined by the General <br /> Manager, such other fire mitigation measure shall be provided that satisfies the Fire <br /> Protection plan as determined by the General Manager. The General Manager shall approve <br /> the location of the Fire Station. The Station shall be dedicated to the MHCSD. <br /> 26. Corporation Yard Facilities: Concurrent with the issuance of each building permit, the <br /> Applicant shall deposit in a MHCSD maintained Corporation Yard Facilities Capital Fund an <br /> amount equal to their pro-rata share (based on the CFF Plan Fee formula as determined by <br /> the MHCSD) of the total cost of the Corporation Yard Facilities as that cost is specified in the <br /> latest update of the CFF Plan Fees. Alternatively, the applicant may construct the <br /> Corporation Yard Facilities, subject to MHCSD design and location approvals. Construction <br /> Conditions of Approval -34- <br />