My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008577
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000267
>
SU0008577
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:34 AM
Creation date
9/5/2019 11:09:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008577
PE
2611
FACILITY_NAME
PA-1000267
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
TRACY
APN
20917003
ENTERED_DATE
1/7/2011 12:00:00 AM
SITE_LOCATION
18500 S HENDERSON RD
RECEIVED_DATE
1/7/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\APPL.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\CDD OK.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\EH COND.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.ENVIRONMENTAL CHECKLIST MOUNTAIN HOUSE NEIGHBORHOODS K AND L INITIAL STUDY <br /> 16.UTILITIES AND SERVICE SYSTEMS <br /> Water distribution pipelines to serve Neighborhoods K and L would be installed <br /> along the neighborhood streets and easements prior to building any houses. <br /> Neighborhoods K and L would be served by extending distribution pipelines from <br /> the existing treated water main on Byron Road. Water distribution system <br /> improvements would be constructed in conjunction with the grading for the street <br /> system and before streets are paved. Construction impacts would include noise <br /> and dust from construction equipment and traffic impacts associated with <br /> removal of spoils and delivery of pipe, valves, and fire hydrants. These impacts <br /> would be temporary,extending only through the period of construction. <br /> Construction impacts were discussed in the 1994 MEIR. No additional <br /> construction-related mitigation measures are necessary. <br /> Demand for Water Service. As already noted,the currently proposed <br /> development would allow a similar number of dwelling units and about 190 more <br /> 'obs than anticipated with SPIT. The proposal would not create substantial new <br /> 1 P P P <br /> water demand beyond that evaluated in the SPII Initial Study. The water <br /> demand projected for all of SPII was 5,462 acre-feet per year(afly). The <br /> demand for the project would not create a need for new or expanded water <br /> facilities beyond those previously evaluated. <br /> An SB 610 CEQA analysis and an SB 221 Subdivision Analysis for Water Supply <br /> have both been completed and certified by the San Joaquin County Board of <br /> Supervisors for the entire SPII area. These analyses confirmed that an adequate <br /> water supply was available for all of SPIT. <br /> Wastewater Facilities. The MHCSD would provide wastewater service to the i <br /> project. To serve the proposed project site, additional pipeline extensions from <br /> the existing backbone line located north of Byron Road, including some lift <br /> stations,would be installed and extended. Smaller sewer lines would be <br /> constructed under roadways to serve individual homes and businesses. <br /> Local sanitary sewers to serve Neighborhoods K and L would be installed along <br /> the streets and easements prior to building any houses. Due to elevation ' <br /> variations, local sewers may convey wastewater by gravity flow to a set of three -_ <br /> pump stations. These stations would operate in series to lift or pump the <br /> wastewater through force mains to sewers at higher elevations. Eventually, theI <br /> wastewater would be pumped up to the existing 30-inch main trunk sewer north ? <br /> of the WWTP. <br /> Construction of the sewers would be done in conjunction with the grading for they <br /> street system and before the streets are paved. Construction impacts would <br /> include noise and dust from construction equipment and traffic impacts <br /> associated with removal of spoils and delivery of pipe and pre-cast concrete <br /> manholes. These impacts would be temporary, extending only through the <br /> period of construction. Construction impacts were discussed in the 1994 MEIR <br /> and the SPIT Initial Study. No additional sewer construction-related mitigation I <br /> measures are necessary. <br /> f <br /> �r <br /> 5-200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.