Alley Parking <br /> The project features a number of alleys that provide either secondary access or primary access to 1.000, <br /> properties. Tentative maps providing such alleys have been approved by the Planning <br /> Commission and/or the Board of Supervisors in the past. However,the experience of the <br /> MHCSD with built alleys in Mountain House is that they are problematical. Although existing and <br /> proposed alleys have a minimum pavement width of 20 feet(and a required right-of-way width of <br /> 30 feet), parking along alleys has created problems for emergency vehicles (e.g., police, fire) and <br /> for maintenance vehicles (e.g., street cleaning equipment). These problems are exacerbated by <br /> alleys that provide the only drivable access to homes. <br /> To address the problems caused by alleys providing the only drivable access to homes, CDD has <br /> added Condition of Approval No. 8 for Neighborhood L. COA No. 8 requires congregate off-street <br /> parking for two alleys, YY Lane and XX Lane, which provide the only access to homes fronting the <br /> lake. For these lots, congregate off-street parking at a rate of 1.5 parking spaces per lot would be <br /> required. As an alternative, YY Lane and XX Lane could be changed to conform to a Local <br /> Residential Type I road. <br /> Additional Park Land <br /> In response to odor and noise concerns due to the proximity of residential lots to the wastewater <br /> treatment plant, the Tentative Map for Neighborhood L was revised to create two park land buffer <br /> parcels: a 421 acre parcel directly northwest of the sewer plant holding ponds and adjacent to the <br /> Old River Regional Park, and a 4.26 acre parcel southwest and adjacent to said parcel ("Parcel <br /> Y"). The buffer parcel adjacent the Old River Regional Park has been included in that regional <br /> facility. Parcel Y will be developed at the same time as the Old River Regional Park segment is <br /> developed. Although the MHCSD will maintain Parcel Y, its maintenance will be paid through a <br /> Lighting and Landscape District, which the homeowners in Neighborhood L will pay annually in <br /> their taxes. <br /> Environmental Review <br /> An Initial Study, the Initial Study for Neighborhoods K and L at Mountain House ("Initial Study") <br /> was prepared for the project in September 2011. Based on the Initial Study, the Community <br /> Development Department("CDD") determined that additional environmental review was required, <br /> and that a Mitigated Negative Declaration would need to be prepared. The Initial Study identified <br /> potential new or additional significant environmental effects that were not analyzed in the 1994 <br /> Mountain House Master Plan Final Environmental Impact Report("MEIR"). However, by <br /> incorporating specified feasible mitigation measures or alternatives into the project, the Initial <br /> Study determined that these significant, identified environmental effects would be avoided or <br /> mitigated to a level of insignificance. <br /> The additional, Initial Study mitigation measures noted above are provided in Appendix B. They <br /> have been accepted by the applicant, and have either been included in the project as a revision to <br /> the Tentative Maps or as Conditions of Approval. <br /> Because a Mitigated Negative Declaration is required for the project, the Planning Commission <br /> will need to make the following findings in its approval of the Initial Study for the project: <br /> 1. The MEIR was certified more than five years prior to filing the application for the project; <br /> 2. After completing the Initial Study, it has been determined that a Mitigated Negative <br /> Declaration would address substantial changes that have occurred with respect to the <br /> circumstances under which the MEIR was certified and would address new information; <br /> and <br /> .I <br /> 32 <br />