My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011318
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
2600 - Land Use Program
>
PA-1700072
>
SU0011318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 11:59:44 AM
Creation date
9/5/2019 11:18:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011318
PE
2633
FACILITY_NAME
PA-1700072
STREET_NUMBER
20500
Direction
S
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95304-
APN
21216010
ENTERED_DATE
4/17/2017 12:00:00 AM
SITE_LOCATION
20500 S HOLLY DR
RECEIVED_DATE
4/17/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\H\HOLLY\20500\PA-1700072\SU0011318\APPL.PDF \MIGRATIONS\H\HOLLY\20500\PA-1700072\SU0011318\CDD OK.PDF \MIGRATIONS\H\HOLLY\20500\PA-1700072\SU0011318\EHD COND.PDF \MIGRATIONS\H\HOLLY\20500\PA-1700072\SU0011318\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> Community Development Department <br /> PA-1700072(SA) <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 9. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 10. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 11. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> 12. The San Joaquin County Interim Flood Hazard Reduction Policy shall apply for this project. Post- <br /> development discharge to Sugar Cut shall be attenuated to the predevelopment discharge to prevent <br /> an increase in the 100-year flood water surface elevations in the cut. A hydrologic analysis <br /> prepared by a registered civil engineer shall be submitted for review and approval.A fee to review <br /> the analysis shall be required. If the proposed design utilizes detention basins,they shall be fenced <br /> with six(6)foot high chain link fence or equal when the maximum-design depth is 18 inches or <br /> more. Required detention capacity calculations shall be submitted for review and approval prior to <br /> release of building permit for the project. Additionally,the current owner of the property will be <br /> responsible to ensure that there is capacity in the system at the time of issuance of a building <br /> permit. (Development Title Section 9-1135) <br /> 13. All new construction and the substantial improvement of any structure in an area of special flood <br /> hazard shall be elevated or floodproofed in accordance to San Joaquin County Ordinance Code <br /> Section 9-1605.12 (a),(b),and(c). <br /> 14. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase U National Pollutant Discharge Elimination <br /> System(NPDES)permit and shall comply with the following conditions: <br /> a. A registered professional engineer shall design a system or combination of systems to <br /> infiltrate,treat,and/or filter the 85th percentile storm as defined in the County's Post- <br /> Construction Standards Manual. The system design shall follow standards as outlined in <br /> the 2009 Storm Water Quality Control Criteria Plan or in the"California Association of <br /> Stormwater Quality Agencies"(CASQA)publications and comply with the conditions of <br /> the County Phase II NPDES permit. CASQA documents are available at www.casga.org <br /> b. Owner shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works for <br /> review. A SWPPP preparation guide is available at the Department of Public Works. A <br /> copy of the SWPPP shall be maintained on the construction site and presented to any <br /> County,State or Federal employee on demand. The SWPPP onsite shall include all required <br /> records,updates,test results and inspections. The post construction chapter of the SWPPP <br />
The URL can be used to link to this page
Your browser does not support the video tag.