My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:23:29 AM
Creation date
9/5/2019 1:04:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0601856SV <br /> April 7,2006 %fto <br /> Page 4 of 5 <br /> All work shall be performed in accordance with the current Department of Transportation <br /> Standard Specifications and the Department of Transportation Encroachment Permit Utility <br /> Provision dated August 1998. <br /> All work shall be conducted in such a manner that the excavation, excavated earth, materials and <br /> equipment will not cause any inconvenience to the highway traffic or to traffic entering the <br /> highway from any public or private approach. <br /> No earth or construction materials are to be dragged or scraped across the highway pavement. <br /> No excavated earth shall be placed or allowed to remain at a location where it can be tracked <br /> onto the highway traveled way or any public or private approach by the Permittee's construction <br /> equipment, or by traffic entering or leaving the highway traveled way. Any excavated earth or <br /> mud so tracked onto the highway pavement or public or private approach shall be immediately <br /> removed by the Permittee. <br /> Permittee's attention is directed to Section 19 of the State Standard Specifications. <br /> Where facilities exist, a minimum sidewalk and bikepath width of 4 feet (1.21m) must be <br /> maintained at all times for safe passage through the work area. <br /> Whenever the work causes obliteration of pavement delineation, temporary or permanent <br /> pavement delineation shall be in place prior to opening the traveled way to public traffic. <br /> Lanelinc or centerline pavement delineation shall be provided at all times for traveled ways open <br /> to public traffic. On multilane roadways edgeline delineation shall be provided at all times for <br /> traveled ways open to public traffic. <br /> Whenever lanelines and centerlines are obliterated, the minimum laneline and centerline <br /> delineation to be provided shall be temporary reflective raised pavement markers placed at <br /> longitudinal intervals of not more than 24 feet (7.32 m). The temporary reflective raised <br /> pavement markers shall be the same color as the laneline or centerline markers they replace. <br /> When work is not in progress on a trench or other excavation that required closure of an adjacent <br /> lane, the traffic cones or portable delineators used for the lane closure shall be placed off of and <br /> adjacent to the edge of the traveled way. The spacing of the cones or delineators shall not be <br /> more than the spacing used for the lane closure. <br /> Where it is necessary to excavate under existing curb and gutter, or underground facilities, the <br /> void shall be backfilled with two (2) sack cement-sand slurry. <br /> Excavated material shall be immediately removed from the site and backfilling operations shall <br /> begin as the installations progress. Backfill shall be in conformance to Caltrans Standard <br /> Specifications, Section 19. <br /> Upon completion of each installation, all excavation within the highway roadbed shall be <br /> backfilled and compacted in conformance to Caltrans Standard Specifications, Section 19. <br /> Backfill for installations outside the highway roadbed shall be thoroughly compacted to a density <br /> that existed prior to excavation, and made to conform to the surrounding ground surface. <br /> Base material shall conform to Caltrans Standard Specifications, Section 26. <br />
The URL can be used to link to this page
Your browser does not support the video tag.