Laserfiche WebLink
f. Landscaping shall be installed in accordance with the approved Site Plan and <br /> Improvement Plan. Landscaping details shall be consistent with Chapter 9-1020 of the <br /> Development Title, be included on the Improvement Plan, and be installed prior to <br /> issuance of the Certificate of Occupancy for the office/maintenance building. <br /> g. Litter shall be picked up on a daily basis on the project site and along the site's frontage <br /> on MacArthur Drive. Litter shall be picked up on surrounding properties as needed. <br /> h. Except for the wood and yard waste composting operations, all waste handling and <br /> transfer operations shall take place within the approved transfer building. <br /> i. All doors,windows, and unscreened openings at the transfer building shall remain closed <br /> unless in actual use. <br /> j. All new cuts and fills shall be consistent with the geotechnical recommendations <br /> contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1, the <br /> following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or set <br /> back all improvements at least 30 feet from the top and bottom of slopes, or erect <br /> landslide debris barriers. <br /> k. Construction of fills, foundations, slabs, and roadways on the site shall be in accordance <br /> with the geotechnical recommendations contained in Appendix F of the Final EIR. <br /> I. Placement of plastic sheeting, debris fences, sift fences, and/or hay bales shall be utilized <br /> to protect disturbed surfaces during storms during construction activities. Following <br /> construction, all disturbed surfaces, especially slopes, shall be revegetated. <br /> M. The area where the windrows will be located for the outdoor wood and yard waste <br /> composting shall be paved. <br /> n. Personnel working with the"load screening program' and on the'lipping floor' shall have <br /> 40 hours of OSHA training on spill containment, personal protective equipment, and the <br /> handling of recyclable household hazardous materials. <br /> o. Any mitigation monitoring done by the Community Development Department shall be <br /> done on a time and materials basis paid for by the applicant. <br /> 2. AIR POLLUTION CONTROL DISTRICT: <br /> a. A PM10 Dust Prevention and Control Plan shall be prepared that includes the dust control <br /> measures specified in Chapter 4.7, Mitigation 4.7-1, of the Final EIR. <br /> b. A Standard Operating Procedure (SOP) shall be developed to address the elimination of <br /> the generation and emission of odors as much as possible. The SOP shall include <br /> measures to allow for the shortest possible holding time of waste brought to the facility, <br /> as well as contingency measures in the event of excess odor generation and/or nuisance <br /> complaint. <br /> C. The tipping floor area and transfer trailers shall be cleaned daily. Transfer trailers shall <br /> be periodically steam cleaned to remove accumulated grease and dirt. <br /> Conditions of Approval - 2 - UP-93-4 <br />