My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002360
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
UP-93-04
>
SU0002360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 2:11:53 PM
Creation date
9/6/2019 9:54:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002360
PE
2626
FACILITY_NAME
UP-93-04
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\0\UP-93-04\SU0002360\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. DEPARTMENT OF FISH AND GAME: <br /> a. In carrying out the operations of the project, the applicant shall take no actions that <br /> violate the provisions of the State or Federal Endangered Species Acts or any regulations <br /> promulgated pursuant thereto. Compliance with said laws shall be the sole responsibility <br /> of the applicant, and the applicant shall agree to indemnify, defend, and hold the County <br /> harmless from and against any claim or action by affected State or Federal agencies as <br /> to the project's compliance with said laws. <br /> b. Not more than 60 days prior to construction, a professional biologist retained by the <br /> applicant shall conduct a preconstruction survey of the site for the presence of the San <br /> Joaquin kit fox. If any kit foxes are found, precautions specified in Chapter 4.2, Mitigation <br /> 4.2-4, shall be taken. <br /> C. Not more than 60 days prior to construction, a professional biologist retained by the <br /> applicant shall conduct a preconstruction survey of the site for the presence of Burrowing <br /> owls and avoid adverse impacts on Burrowing owls, if present, as specified in Chapter <br /> 4.2, Mitigation 4.2-6. <br /> 4. DEPARTMENT OF PUBLIC WORKS: <br /> a. The driveway approaches with a right-turn lane at the north entrance shall be improved <br /> in accordance with the requirements of San Joaquin County Standards R-17 and R-27 <br /> prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> b. Dedicate a 42-foot-wide right-of-way from the centerline of MacArthur Drive to the property <br /> line along the frontage of APN 253-130-19. (Development Title Section 9-1150.2) <br /> C. MacArthur Drive from the north driveway to the entrance to the gravel operation lying <br /> immediately north of the project shall be upgraded structurally to provide for the <br /> difference between the present Traffic Index and the Traffic Index for the proposed <br /> development. The upgrade shall be constructed in conformance with the Improvement <br /> Standards and Specifications of the County of San Joaquin. All improvement plans and <br /> specifications must be approved by the County of San Joaquin Department of Public <br /> Works prior to approval of the Improvement Plan. (Development Title Section 9-1150.2) <br /> d. An encroachment permit shall be required for work within the road right-of-way. <br /> (Development Title Section 9A 145.2) <br /> e. The Traffic Impact Mitigation Fee will be required for this development subject to such off- <br /> setting credit, if any, for closure of Corral Hollow Landfill as may be agreed to by the <br /> County. The fee is due and payable prior to the time of building permit application. <br /> Eighty percent of the fee may be deferred over a period not to exceed five years by <br /> entering into a Deferred Traffic Impact Mitigation Fee Payment Agreement with the <br /> County. If deferred, the initial payment is 20 percent of the total fee based on $249.99 <br /> per daily trip-end generated in the Tracy area. The fee shall be automatically adjusted <br /> annually by the Engineering Construction Cost Index as published by the Engineering <br /> News Record. (Resolutions R-90-304, R-91-1025, and R-93-167) <br /> f. The applicant shall prepare an analysis of Corral Hollow Creek for a 24-hour, 100-year <br /> storm event. If necessary, berming shall be constructed to protect the site. <br /> Conditions of Approval - 3 - UP-93-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.