My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002360
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
UP-93-04
>
SU0002360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 2:11:53 PM
Creation date
9/6/2019 9:54:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002360
PE
2626
FACILITY_NAME
UP-93-04
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\0\UP-93-04\SU0002360\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMENTS ON DEVELOPMENTS <br /> UP-93-4 <br /> 2 . Dedication to result in a 42-foot wide right-of-way from the <br /> centerline of MacArthur Drive to the property line shall be <br /> required along the frontage of APN 253-130-19 . <br /> (Development Title Section 9-1150. 2) <br /> 3 . A traffic study shall be conducted to determine the impacts & <br /> mitigation measures on County road system. The developer shall <br /> deposit funds with the County for all costs, as estimated by <br /> the Public Works Department Public Facilities Division, prior <br /> to Public Works Department preparing or contracting for the <br /> required study. (Development Title Section 9-1150 . 4) <br /> 4 . The frontage improvements for MacArthur Drive as required by <br /> the traffic study shall be constructed in conformance with <br /> the with the Improvement Standards and Specifications of the <br /> County of San Joaquin. All improvement plans and specification <br /> must be approved by the County of San Joaquin Department of <br /> Public Works prior to approval of the Improvement Plan. <br /> (Development Title Section 9-1150. 2) <br /> 5. Encroachment permit shall be required for work within road <br /> right-of-way. (Development Title Section 9-1145. 2) <br /> 6. The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable prior to the time <br /> of building permit application. (80% of the fee may be <br /> deferred over a period not to exceed five (5) years by entering <br /> a Deferred Traffic Impact Mitigation Fee Payment Agreement with <br /> the County. The initial payment is 20% of the total fee based <br /> on $249.99 per daily trip-end generated in the Tracy area if <br /> deferred. The fee shall be automatically adjusted annually by <br /> the Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> (Resolution R-90-304, R-91-1025, R-93-167) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.