Laserfiche WebLink
PgU1N. <br /> COUNTY OF SAN JOAQUIN <br /> ?: EUGENE DELUCCHI <br /> Q: l� CHIEF DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> (209)468-3000 MANUEL LOPEZ <br /> F O P� FAX(209)468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA RICHARD C.PAYNE <br /> DEPUTY DIRECTOR <br /> DIRECTOR <br /> April 7 , 1993 <br /> M E M O R A N D U M <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT. UP-93-3 for a golf driving range to be completed in two <br /> (2) phases. Located on the W. side of MacArthur Dr. , S. of Canal <br /> Blvd. , N. of Tracy. <br /> APPLICANT: Derriel Hayes APN: 213-040-07 <br /> INFORMATION: <br /> The site is located within a Federal Flood Insurance Administration <br /> Designated Flood Hazard Area. The 100-Year Flood Elevation will be <br /> approximately 20 feet NGVD. <br /> MacArthur Drive has an existing right-of-way width of 60 feet, and <br /> a planned right-of-way width of 60 feet. <br /> RECOMMENDATIONS: <br /> 1. The frontage improvements for MacArthur Drive shall be <br /> constructed in conformance with standards for one-half of a <br /> 60-foot right-of-way rural collector road. The construction of <br /> the frontage improvements will be deferred upon execution by <br /> the owner of a Deferred Frontage and Roadway Improvement <br /> Agreement or a Secured Deferred Frontage and Roadway <br /> Improvement Agreement with a deposit equivalent to their <br /> estimated construction costs prior to approval of the <br /> improvement Plan. (A $260. 00 fee currently is required for <br /> processing per Development Title Table 9-240. 2 in addition to <br /> a copy of the Grant Deed and an estimate for the required <br /> frontage improvements. The estimate shall be prepared by a <br /> Registered Civil Engineer with a typical section drawing on a <br /> form to be supplied by the Public Works Department and <br /> submitted to the Public Works Department for approval. As an <br /> option the Department of Public Works will prepare the drawing <br /> and estimate for an additional fee of $115. 00 . ) <br /> (Development Title Section 9-1150.2) <br /> 1 <br />