Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> UP-93-3 <br /> 2 . The driveway approach shall be improved in accordance with <br /> the requirements of the San Joaquin County Standards R-17 <br /> prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145. 5) <br /> 3 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Section 9-1145. 2) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $236 . 33 <br /> per daily trip-end generated in the Tracy area. The fee shall <br /> be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />