My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004379
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
28983
>
2600 - Land Use Program
>
PA-0200080
>
SU0004379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:45 AM
Creation date
9/6/2019 9:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004379
PE
2632
FACILITY_NAME
PA-0200080
STREET_NUMBER
28983
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25312047
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
28983 S MACARTHUR DR
RECEIVED_DATE
3/6/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\APPL.PDF \MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\EH COND.PDF \MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-02-80 <br /> Calaveras Materials, Inc. <br /> Site Approval Application No. PA-02-80 was approved by the San Joaquin County Community <br /> Development Department on March 13, 2002. The effective date of approval is March 23, 2002. This <br /> approval will expire on September 22, 2003, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building perrnits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Jennifer Jolley, 468-3161) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details (including gates), on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the establishment of a concrete batch plant facility. The <br /> facility will consist of a batch plant apparatus, a 1,920-square-foot office/driver lounge, and a 280- <br /> square-foot batch office as shown on the site plan dated March 6, 2002 (Use Type: General <br /> Industrial —Heavy). The project will be constructed in three phases as follows: <br /> (1) Phase I: Construction of the batch plant apparatus, office/drive lounge, and the batch office. <br /> Paving of both access driveways off of Mac Arthur Drive and the driveway west of the <br /> existing PG & E Substation connecting the two driveways. Also, paving for six(6)truck <br /> spaces must be provided. Building permits shall be issued within eighteen (18) months of the <br /> date of approval. <br /> (2) Phase II: Paving for the employee and remaining truck parking area. Also, the paving of the <br /> driveway into the batch apparatus and truck wash areas. This phase shall be completed <br /> within three (3) years from the date of approval. <br /> (3) Phase III: Paving of the aggregate truck-unloading route. This phase shall be completed <br /> within five (5) years from the date of approval. <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. The Business License may be applied for concurrently with the building permit <br /> application. (Section 7-1000 of the County Ordinance Code) <br /> d. STORM DRAINAGE: Storm water drainage shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. <br /> Conditions of Approval - 1 - PA-02-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.