My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004379
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
28983
>
2600 - Land Use Program
>
PA-0200080
>
SU0004379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:45 AM
Creation date
9/6/2019 9:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004379
PE
2632
FACILITY_NAME
PA-0200080
STREET_NUMBER
28983
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25312047
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
28983 S MACARTHUR DR
RECEIVED_DATE
3/6/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\APPL.PDF \MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\EH COND.PDF \MIGRATIONS\M\MACARTHUR\28983\PA-0200080\SU0004379\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
feet east of South Patrick Road, east of Stockton(APN: 103-110-06; Address: <br /> 10848 E.Copperopolis Road, Stockton). <br /> The applicant did not appear for this item. <br /> 11:00 a.m. 5. SITE APPROVAL APPLICATION NO.PA-0200011 OF GEMINI <br /> JJ INCORPORATED. A Site Approval application to establish a childcare facility <br /> and to install a 20' x 90' mobile classroom onto the site. Located on the <br /> northeast comer of East Tenth Street and Bieghle Street, Stockton(APN: 171- <br /> 152-28;Address: 1807 East Tenth Street, Stockton). <br /> Jennifer Jolley,Associate Planner,and Bobby Bivens,Gemini,Inc.,were present for this project. <br /> Ms.Jolley introduced the project. 'Ms.Jolley reviewed the Development Committee memo.Mr. Bivens <br /> indicated that the parking was excessive. Ms.Jolley asked Mr.Bivens to submit a letter stating why he <br /> feels the parking is excessive and indicate the number of spaces he feels is adequate. <br /> Mr.Bivens informed the Committee that the maximum number of thirty-(30)children is incorrect and <br /> that there will be only twenty-(20)children at the childcare center. <br /> Mr.Neely reviewed the Public Works Department requirements. Mr.Neely indicated that the driveway <br /> must be realigned. Options for the driveways were discussed. <br /> Mr.Darrow asked what was the use for the existing building. W. Bivens indicated that it was a church. <br /> Mr.Darrow indicated that there would need to be a change of occupancy. Mr.Bivens indicated that when <br /> Head Start moved in they obtained an approved Site Approval application and installed children sized <br /> stalls in the restrooms. Ms.Jolley confirmed that there was a previous Site Approval approved but that it <br /> was never finaled,because some of the requirements were not met. Ms. Jolley indicated that she would . <br /> research the previous Site Approval to see what requirements were completed. <br /> Mr.Martin indicated that if Mr.Bivens proceeds with the application that there may be some building <br /> conditions that will be added to this approval. <br /> Mr.Martin informed Mr.Bivens that the Improvement Plan will need to be done by a Civil Engineer or <br /> Certified Architect. <br /> 11:30 a.m. 6. SITE APPROVAL APPLICATION NO PA-0200019 OF JOE BERGHOLD <br /> JJ (C/O MIKE SMITH ENGINEERING). A Site Approval application for a <br /> small winery to be constructed in three phases. Phase 1.To convert an existing <br /> agricultural storage building into a wine processing and administration building. <br /> Also add an access road to Cherry Lane and parking area adjacent to process <br /> building. Phase 2.To construct a building for a tasting room,barrel,and case <br /> storage,and construct a parking and garden area. Phase 3.To expand the <br /> processing building. Located on the north side of State Route 12 Highway,on the <br /> northwest comer of Cherry Road,northeast of Lodi(APN: 051-030-09; Address: <br /> 8215 E. State Route 12 Highway,Lodi). <br />
The URL can be used to link to this page
Your browser does not support the video tag.