Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200001 <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $184.54per daily trip-end generated in the <br /> Tracy area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. A credit may be allowed if it can be verified <br /> that the existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066) that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. An Engineering Study of Mac Arthur Road shall be required. The Engineering study shall determine the <br /> adequacy of roadway width, structural section, R-value, Traffic index, safety and shoulder requirements. <br /> The study shall be based on traffic generation from the proposed project. All truck trips, including gravel <br /> and cement deliveries and concrete trucks utilizing the facility shall be used for the traffic index. The <br /> report shall recommend improvements required to Mac Arthur Road to mitigate the increased truck traffic <br /> and to comply with the County standards for a period of 10 years. The applicant shall be required to do <br /> all mitigations required by the Engineering Study. <br /> 7. A Maintenance Agreement to ensure that Mac Arthur Road and any other County roads utilized as a haul <br /> route is maintained to a condition acceptable to San Joaquin County shall be executed by the applicant. <br /> The Maintenance Agreement shall remain in force for the duration of operation under this permit. The <br /> applicant shall pay a$465.00 fee for preparing the Maintenance Agreement. <br /> GK:BN:sh <br />