My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004138
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29006
>
2600 - Land Use Program
>
QX-91-0002
>
SU0004138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 4:13:26 PM
Creation date
9/6/2019 9:55:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004138
FACILITY_NAME
QX-91-0002
STREET_NUMBER
29006
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
29006 S MACARTHUR DR
RECEIVED_DATE
3/27/1995 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29006\QX-91-02\SU0004138\EH TRACK LOG.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
open-pit mining method will be used to remove the sand and gravel. Mined aggregate will <br /> be transported by trucks and/or conveyor belt from the Rose mining site to the adjacent <br /> r <br /> Teichert plant. Five to seven employees are required on site to conduct the mining <br /> operation. Proposed hours of operation are 5 AM to 10 PM, Monday through Saturday. (It <br /> is understood that Teichert may request extended hours in case of emergency or for special <br /> jobs.) Water spraying trucks will ensure the reduction of dust emission. No on-site <br /> Am ponding is necessary since screening, crushing, and storage are to occur off site. <br /> 'm The conveyor system, if used, would cross MacArthur Road at a point near the southern <br /> boundary of the Rose property. Either an under-crossing using an open-cut placement of <br /> culvert or an over-crossing which encloses the conveyor on three sides would be used. In <br /> the case of the over-crossing, the structural supports would be located outside the MacArthur <br /> Road right-of-way and the height would be about 16' above the roadway to allow adequate <br /> clearance for traffic. The truck crossing would also be located near the southerly boundary <br /> of the Rose property. A structural section of road 25' in width is proposed to accommodate <br /> the trucks. An encroachment permit will be obtained for any work in the public right-of- <br /> way. <br /> ` Time Frame <br /> Teichert estimates that once mining begins, it will require approximately three years to mine <br /> the Rose property. The commencement date for excavating the Rose property ties into <br /> harvesting activity on adjacent Teichert parcels. The duration of mining is dependent upon <br /> local demand for construction aggregate. Reclamation of the site will commence upon the <br /> completion of mining activity. <br /> L <br /> Mining Process <br /> ` Excavation of this site will result in alteration of the topography. Prior to mining, the farm <br /> structures and the orchard will be removed. The well will be abandoned according to <br /> Health Department permit requirements. <br /> L <br /> V <br /> IMP <br /> 2 MSO464-B <br /> IN. <br />
The URL can be used to link to this page
Your browser does not support the video tag.