open-pit mining method will be used to remove the sand and gravel. Mined aggregate will <br /> be transported by trucks and/or conveyor belt from the Rose mining site to the adjacent <br /> r <br /> Teichert plant. Five to seven employees are required on site to conduct the mining <br /> operation. Proposed hours of operation are 5 AM to 10 PM, Monday through Saturday. (It <br /> is understood that Teichert may request extended hours in case of emergency or for special <br /> jobs.) Water spraying trucks will ensure the reduction of dust emission. No on-site <br /> Am ponding is necessary since screening, crushing, and storage are to occur off site. <br /> 'm The conveyor system, if used, would cross MacArthur Road at a point near the southern <br /> boundary of the Rose property. Either an under-crossing using an open-cut placement of <br /> culvert or an over-crossing which encloses the conveyor on three sides would be used. In <br /> the case of the over-crossing, the structural supports would be located outside the MacArthur <br /> Road right-of-way and the height would be about 16' above the roadway to allow adequate <br /> clearance for traffic. The truck crossing would also be located near the southerly boundary <br /> of the Rose property. A structural section of road 25' in width is proposed to accommodate <br /> the trucks. An encroachment permit will be obtained for any work in the public right-of- <br /> way. <br /> ` Time Frame <br /> Teichert estimates that once mining begins, it will require approximately three years to mine <br /> the Rose property. The commencement date for excavating the Rose property ties into <br /> harvesting activity on adjacent Teichert parcels. The duration of mining is dependent upon <br /> local demand for construction aggregate. Reclamation of the site will commence upon the <br /> completion of mining activity. <br /> L <br /> Mining Process <br /> ` Excavation of this site will result in alteration of the topography. Prior to mining, the farm <br /> structures and the orchard will be removed. The well will be abandoned according to <br /> Health Department permit requirements. <br /> L <br /> V <br /> IMP <br /> 2 MSO464-B <br /> IN. <br />