Laserfiche WebLink
Is all or a portion Salthis property subject toy Williamson Land Act <br /> contract ( i . e . , an agricultural preserve ) ? Yes No x <br /> or Anticipated annual production ( include all mined materials such as <br /> overburden, waste rock, ore, etc . ) :_ 1 .4 million cubic yards; however, <br /> subject to market demand. <br /> History <br /> L Is the proposal an expansion of an existing and/or historic mine or <br /> quarry? x Yes No . If yes , describe briefly ( specify existing, <br /> historic, or both . ) <br /> See text and Can Inaquin Counry D 't /!FP R 10 <br /> LExcavation/Reclamation Schedule <br /> Estimated Time Frames Begin End <br /> LExploration None _ None <br /> Construction — 6 months nrior to mining_ startup <br /> Operation See text <br /> Reclamation See text <br /> For seasonal operation, list operating months <br /> Operational Characteristics <br /> i <br /> b. Will there be any potentially hazardous materials , such as toric <br /> substances , flammables , or explosives used or stored at the site? <br /> Yes x No <br /> If yes , describe the method of use , storage, and disposal : See text <br /> V <br /> Estimated number of employees : <br /> Construction Phase 20 <br /> LOperational Phase ( s ) 5-7 <br /> Describe the proposed access_ to the project : <br /> x Frontage on Count <br /> y/State Highway. <br /> Private Road Easement width length <br /> From what County or State road? <br /> b. Prescriptive Right <br /> x Other (explain) See maps and text <br /> Application Form <br /> Quarry Excavation - 3 - ( 3/89 ) <br /> L <br />