Laserfiche WebLink
i <br /> Describe off-site honing of sand, aggregate okvif waste, or other <br /> mined material? x Yes —No If Yes , specify: <br /> i <br /> LNumber of one-way truck trips per day : Peak 269 Average 260 <br /> Num4)-r of one-way truck trips per week: Peak 1345 Average 1345 <br /> C . Primary public roads used for hauling : MacArthur <br /> Describe proposed on-site and off-site road improvements : <br /> A . On-site Width Surface Pave first ± 100' of access road with <br /> Location MacArthur _ asphalt. <br /> H. Off-site Width —Surface <br /> Location <br /> Describe the mined material iecove"ry process ( type of process , method, <br /> size and type of crushing equipment ) : Please refer to EP-84-10. Screening <br /> and crushing will take place at existing permitted site to the west. <br /> L <br /> 9 — <br /> Location of the recovery process ( es ) :- On adjacent lands under operation to <br /> �I the west. (Refer to EP-84-10) <br /> iii C. no Activities Operatlnq Hours Day's of the 14ee : <br /> Blasting N/A <br /> hauling 5 am - 10 pm 6 <br /> f Ore __traction 5 am - 10 pm 6 <br /> O'Ls ' ng/processing N/A <br /> OU':=_ ( spedfv ) <br /> V <br /> 1' ind-Istrial w--_. requirements : There may be a minimal amount of water used for <br /> for dust control and other incidental uses. However, it should be noted that usage <br /> reeuired oer day of water for processing is not a part <br /> i So-rce <br /> of this application which is for excavation <br /> and reclamation only. <br /> Soe_ce e' domestic water : <br /> - _ . eta o;•-_ _ N/A =te_ district <br /> LMethod of sewaqe disposal : N/A <br /> Septic system Sewer district ( specify which ) <br /> Holding tank Other <br /> v <br /> On <br /> Quarry Excavation - 4 <br /> L <br />