My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004099
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29293
>
2600 - Land Use Program
>
QX-84-0010
>
SU0004099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 5:14:20 PM
Creation date
9/6/2019 9:55:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004099
FACILITY_NAME
QX-84-0010
STREET_NUMBER
29293
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
29293 S MACARTHUR DR
RECEIVED_DATE
4/1/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29293\QX-84-10\SU0004099\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED CONDITIONS OF APPROVAL <br /> OX-84-10 <br /> Teichert Land Company <br /> Revisions of Approved Actions for Quarry Excavation Application No. QX-84-10 was approved by <br /> the San Joaquin County Planning Commission on May 16, 2002. The effective date of approval is <br /> May 16, 2002. <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1. Condition 15 shall be as follows: <br /> The rehabilitation of each phase shall be completed, in conformance with the rehabilitation plan, <br /> within two (2) years of the completion of the extraction portion of that phase. Rehabilitation shall be <br /> completed as soon as feasible. The schedule for rehabilitation will be a part of the approval of the <br /> excavation. It will define each phase of the excavation. The phases may be based on the sequence <br /> in which individual areas are to be excavated and rehabilitated, or on the sequence in which various <br /> operations are to be carried out in each area during each phase. The cost of rehabilitation shall be <br /> determined for each phase in order to determine the amount of performance guarantee. <br /> Rehabilitation of parcels 253-120-14 and 27, known as the Traina West parcel, may be deferred while the <br /> Traina West parcel is used for the storage and filtering of water from the Tracy Rock Plant(parcel 253-120- <br /> 12) Rehabilitation of the Traina West parcel shall be completed within two years of the time the Traina West <br /> parcel is no longer used for the storage and filtration of water from the Plant and prior to 14 years from the <br /> approval of the Revisions of Approved Actions. <br /> 2. The reclamation plan is revised by this action to indicate the following reclamation dates: q <br /> Mitchell-Sexton: On or before December 2002 <br /> Flintkote: On or before December 2006 <br /> Traina West: On or before December 2016 <br />