Laserfiche WebLink
y <br /> Revision of Approved Actions : Tracy Rock EP-84-10 <br /> 2 . State the facts showing the changes in circumstances which <br /> make the subject conditions ( s ) no longer appropriate or <br /> necessary. <br /> Due to changing market forces and the need for continuity <br /> in its operations, Teichert seeks an amendment to its Conditions of <br /> Approval to allow for 24-hour operation. As staff is aware, <br /> Teichert is in the process of designating and bringing on line its <br /> Vernalis operation (QX-91-5) . Recent events and circumstances may <br /> lead to a modification of the project start-up time for Vernalis . <br /> Teichert--in collaboration with the Public Works Department of San <br /> Joaquin County, Caltrans, Lonestar, Granite, and Brown Sand & <br /> Gravel--is analyzing a beneficial traffic throughput directly onto <br /> I-5 . While we are assessing this opportunity and its associated <br /> costs, Teichert's operation south of Linne Road must continue to <br /> supply the market . <br /> Changing conditions in the vicinity of the Tracy Rock <br /> Plant will mean that current hours of operation are not sufficient <br /> to allow Teichert to meet its project demand. To that end Teichert <br /> requests the flexibility to utilize a 24-hour clock. Safety and <br /> efficiency prompt this request. Even though the intensity of <br /> operations is not expected to increase, we need the ability to work <br /> around the traffic congestion which will result when the Waste <br /> Discharge Facility commences operations this summer. <br /> The time frame for this request is strictly limited by <br /> the remaining reserves available to be mined. It is Teichert's <br /> goal to bring Vernalis on line as soon as possible, and at that <br /> point the facilities at Tracy will phase out. If you have any <br /> questions concerning this request for a short-term modification of <br /> Teichert' s operating conditions, please call ( 916/484-3319 ) . <br /> 30161-1 <br />