My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004170
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29293
>
2600 - Land Use Program
>
QX-84-0010
>
SU0004170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 5:03:03 PM
Creation date
9/6/2019 9:55:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004170
FACILITY_NAME
QX-84-0010
STREET_NUMBER
29293
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
29293 S MACARTHUR DR
RECEIVED_DATE
2/12/1993 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29293\QX-84-10\SU0004170\REV APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As part of the Tracy Hills project proposed by Grupe Communities within the City of <br /> Tracy, the Flintkote site is to be utilized for storm water retention ponds on both Plan A <br /> and B. These ponds would also include a drainage pond for the area designated as dry <br /> grazing land and all ponds would be located along the northern boundary of the site. The <br /> two ponds generated by the Tracy Hills project would utilize the existing ponds located in <br /> the northwest comer of the property. A permanent wastewater reclamation facility is also <br /> proposed but only on Plan B. Such a facility would utilize all or part of the area <br /> designated outside the storm water retention ponds and could include settling ponds as <br /> well as a treatment facility. Please note that should the wastewater reclamation facility <br /> option be implemented, it would be subject to additional environmental review and <br /> permitting through the appropriate lead agency. Only Plan C proposes to utilize the site <br /> entirely as dry grazing/pasture land with no involvement from Grupe Communities and <br /> the City of Tracy. As noted on each of the plans, the pastureland would be non-irrigated <br /> and would maintain a uniform slope to the land not to exceed overall 3% grade. <br /> The impetus behind the requested changes to the reclamation plan is the need to address <br /> the Tracy Hills approach to the project site. The proposed storm water retention ponds <br /> and wastewater reclamation facility allows for reuse of the site in a manner which can <br /> better serve the community by locating adverse uses in a location with limited public <br /> access. Furthermore, the facilities would utilize existing ponds and graded areas which <br /> may help to reduce costs. Should the Tracy Hills project choose not to utilize the site for <br /> their facilities, the proposed dry grazing/pasture land would still clean up the site while <br /> allowing the site to be reclaimed in a manner consistent with its original use. <br /> Flintkote Rev Px Phn.at rA.dw 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.