My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004151
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29900
>
2600 - Land Use Program
>
QX-96-0002
>
SU0004151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 11:05:43 AM
Creation date
9/6/2019 9:55:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004151
FACILITY_NAME
QX-96-0002
STREET_NUMBER
29900
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
29900 S MACARTHUR DR
RECEIVED_DATE
10/15/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29900\QX-96-02\SU0004151\CRWQCB.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> OX-96-2 <br /> Olivia Traina Estate <br /> Quarry Excavation Application No. OX-96-2 was approved by the San Joaquin County Planning <br /> Commission on December 5, 1996. The effective date of approval is December 15, 1996. This <br /> approval will expire on June 16, 1998, which is 18 months from the effective date of approval, unless <br /> (1) all Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> secured and remain in force, and (3) all necessary permits from other agencies have been secured <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been Identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Tom Gau, 209-468-2344) <br /> a. APPROVAL: This approval shall be for a phased six-year excavation of the 147-acre <br /> portion of the project site, as shown on the approved Mining and Reclamation Plan. <br /> b. RECLAMATION PLAN: The Mining and Reclamation Plan shall be prepared by a <br /> registered Civil Engineer, showing drainage, driveway access details, on-site parking, <br /> existing and proposed utility services, grading, and reclamation. Storm drainage runoff <br /> shall be retained on the site. The drainage pattern and corresponding storm drain <br /> improvements shall be shown on the Plan. A plan check fee as specified by Section 9- <br /> 240 will be required. The Mining and Reclamation Pian shall be prepared in accordance <br /> with the reclamation standards developed pursuant to Surface and Mining Reclamation <br /> Act (SMARA) Section 2773(b) and approved by all agencies with permit authority prior to <br /> initiating the use. <br /> C. STOCKPILES AND SCREENING: No stockpiled soil or material shall be placed closer <br /> than 25 feet to a property boundary except where shown on plans to provide a landscape <br /> berm for screening (provided that sight distances at road intersections are not impaired). <br /> (Development Title Section 9-1415.3[b]) <br /> d. PRIVATE ROADS: All private roads involved in an excavation shall be maintained so as <br /> to control the creation of dust. The first 100 feet of any private road on the property <br /> which intersects with a publicly maintained road shall be surfaced in a manner approved <br /> by the Director. Traffic-control and warning signs shall be installed, ff required, at such <br /> intersections. The placement and size of these signs shall be approved by the Director <br /> of Public Works. (Development Title Section 9-1415.31c]) <br /> e. EROSION CONTROL: Protective vegetative planting,sift screen dams, or other approved <br /> methods shall be required where necessary for the control of erosion. An erosion and <br /> sediment control plan approved by Development Services Division shall be part of the <br /> reclamation plan. (Development Title Section 9-1415.31d]) <br /> Conditions of Approval - 1 - QX-96-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.