My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004151
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29900
>
2600 - Land Use Program
>
QX-96-0002
>
SU0004151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 11:05:43 AM
Creation date
9/6/2019 9:55:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004151
FACILITY_NAME
QX-96-0002
STREET_NUMBER
29900
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
29900 S MACARTHUR DR
RECEIVED_DATE
10/15/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29900\QX-96-02\SU0004151\CRWQCB.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met <br /> unless otherwise modified by conditions of the Quarry Excavation Permit. (Development <br /> Title Section 9-1415.3[e]) <br /> g. HOURS OF OPERATION: Plant operations shall normally be carried on during the hours <br /> from 5:00 a.m. to 9:00 p.m. Additionally, scraper operations shall not occur 400 feet of <br /> the two existing residences south of the project site during the hours from 10:00 p.m. to <br /> 7:00 a.m. <br /> h. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of <br /> an excavation, the topsoil shall be replaced and the site leveled in conformance with the <br /> excavation permit. (Development Title Section 9-1415.3[g]) <br /> i. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance <br /> with instructions from the Agricultural Commissioner of San Joaquin County. <br /> (Development Title Section 9-1415.3[h]) <br /> j. SETBACKS: No excavation shall take place within 25 feet of the north and east property <br /> of lines, 75 feet from the centerline of MacArthur Drive, and 25 feet from the southern <br /> property line or 100 feet from the centerline of Corral Hollow Creek, whichever is greater. <br /> (Development Title Section 9-1415.3[j]) <br /> k. TEMPORARY CUT SLOPES AT SETBACK LINES: The temporary cut slope shall not <br /> exceed 1.5 horizontal to 1 vertical. <br /> I. FINAL SLOPES: Final slopes shall not exceed 2 horizontal to 1 vertical. A slope stability <br /> analysis shall be prepared which takes into account that the final fill slope is being placed <br /> over a cut slope. The minimum slope stability factors shall comply with requirements of <br /> Development Title Section 9-1415.3(k)(4). <br /> m. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases <br /> of excavation. Reclamation on the phase of an excavation shall be initiated prior to the <br /> start of the next excavation phase. The final reclamation of any phase of excavation shall <br /> be completed within two years of the commencement of the reclamation process. <br /> Excavation shall be limited so that at any point of time a maximum of one phase is being <br /> reclaimed while one phase is being excavated. (Development Title Section 9-1415.3[o]) <br /> n. TIME LIMITATION: The Quarry Excavation Permit shall remain in effect as long as the <br /> excavation continues in compliance with the approved Permit but not longer than six <br /> years from the date the project is started. (Development Title Section 9-1415.3[p]) <br /> 0. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br /> reclamation plan. The County may use professional services as provided for in Section <br /> 9-240.11. The consultant shall be selected by San Joaquin County. Upon completion <br /> of the annual inspection, the person in charge of the mining operation shall submit to the <br /> State Geologist and the County a report which shall contain all the information as <br /> required by Section 2207 of the Public Resources Code. The cost of the inspection shall <br /> be paid by the mine operator. Additional inspections may be conducted, but the cost of <br /> additional inspections shall be paid for by the mine operator only if non-compliance with <br /> Conditions of Approval - 2 - QX-96-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.