Laserfiche WebLink
.� ..i <br /> Development Committee -3- <br /> being excavated to a depth of 62 feet; and, what areas are being <br /> excavated to a depth of somewhere in between. This information <br /> should be provided on the Mining and Reclamation Plan. The <br /> excavation needs to be maintained at least 5 feet above the <br /> highest recorded groundwater. <br /> Consideration should be given to eliminating the berm between the <br /> Rose Pit and the Traina property that would result after both <br /> sites have been excavated. Consideration should perhaps also be <br /> given to excavating to the final slope of 2 to 1. There is an <br /> area in the northeast corner that is shown to be excluded from <br /> excavation it is not clear why this area is being excluded from <br /> the information submitted. The location of BCID easements need <br /> to be shown on the plans. <br /> Tentative Conditions of Approval have been developed and are <br /> attached to this memo for your information and discussion at the <br /> Development Committee meeting to be scheduled November 13th at <br /> 10 : 00 a.m. in the Building Conference Room of the Community <br /> Development Department. If you have any questions regarding this <br /> memo or the tentative Conditions of Approval and wish to discuss <br /> them before the meeting, please contact me at (209) 468-2344 . <br /> TMG: ss <br /> QX96-2 .MEM <br /> c: Teichert Aggregates <br />