My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004151
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29900
>
2600 - Land Use Program
>
QX-96-0002
>
SU0004151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 11:05:43 AM
Creation date
9/6/2019 9:55:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004151
FACILITY_NAME
QX-96-0002
STREET_NUMBER
29900
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
29900 S MACARTHUR DR
RECEIVED_DATE
10/15/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29900\QX-96-02\SU0004151\CRWQCB.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
... ..,i <br /> TENTATIVE <br /> CONDITIONS OF APPROVAL <br /> QX-96-2 <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT• (Staff Contact: Tom Gau, <br /> (209) 465-2344) <br /> a. APPROVAL: This approval shall be for a phased six (6) <br /> year excavation of the 147-acre portion of the project <br /> site, as shown on the approved Mining and Reclamation <br /> Plan. <br /> b. RECLAMATION PLAN: The Mining and Reclamation Plan <br /> shall be prepared by a registered Civil Engineer, <br /> showing drainage, driveway access details, on-site <br /> parking, existing and proposed utility services, <br /> grading and reclamation. Storm drainage runoff shall <br /> be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown <br /> on the Plan. A plan check fee as specified by Section <br /> 9-240 will be required. The Mining and Reclamation <br /> Plan shall be approved by all agencies with permit <br /> authority prior to initiating the use. <br /> C. STOCKPILES AND SCREENING: No stockpiled soil or <br /> material shall be placed closer than 25 feet to a <br /> property boundary except where shown on plans to <br /> provide landscape berm for screening (provided that <br /> sight distances at road intersections are not <br /> impaired) . (Development Title Section 9-1415 . 3 [b] ) <br /> d. PRIVATE ROADS: All private roads involved in an <br /> excavation shall be maintained so as to control the <br /> creation of dust. The first one hundred (100) feet of <br /> any private road on the property which intersects with <br /> a publicly maintained road shall be surfaced in a <br /> manner approved by the Director. Traffic-control and <br /> warning signs shall be installed, if required, at such <br /> intersection. The placement and size of these signs <br /> shall be approved by the Director of Public Works. <br /> (Development Title Section 9-1415 . 3 [c] ) <br /> e. EROSION CONTROL: Protective vegetative planting, silt <br /> screen dams, or other approved methods shall be <br /> required where necessary for the control of erosion. <br /> An erosion and sediment control plan approved by <br /> Development Services Division shall be part of the <br /> reclamation plan. (Development Title Section 9- <br /> 1415. 3 [d] ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.