Laserfiche WebLink
-2- <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter <br /> 9-1025 shall be met unless otherwise modified by <br /> conditions of the Quarry Excavation Permit. <br /> (Development Title Section 9-1415 . 3 [e] ) <br /> g. HOURS OF OPERATION: Plant operations shall normally be <br /> carried on during the hours from 5 : 00 a.m. and 9 : 00 <br /> p.m. Additionally, scraper operations shall not occur <br /> 400 feet of the two (2) existing residences south of <br /> the project site during the hours from 10 : 00 p.m. to <br /> 7 : 00 a.m. <br /> h. REPLACEMENT OF TOPSOIL: The topsoil shall be set <br /> aside, and upon completion of an excavation, the <br /> topsoil shall be replaced and the site leveled in <br /> conformance with the excavation permit. Development <br /> Title Section 9-1415 . 3 [g] ) <br /> i. WEED CONTROL: If noxious weeds are on the site, <br /> operations shall be in accordance with instructions <br /> from the Agricultural Commissioner of San Joaquin <br /> County. (Development Title Section 9-1415 . 3 [h] ) <br /> j . SETBACKS: No excavation shall take place within: <br /> twenty-five (25) feet of the north and east property of <br /> lines; seventy five (75) feet from the centerline of <br /> MacArthur Boulevard; and twenty five (25) feet from the <br /> southern property line or one hundred (100) feet from <br /> the centerline of Corral Hollow Creek, whichever is <br /> greater. (Development Title Section 9-1415 . 3 [j ] ) <br /> k. TEMPORARY CUT SLOPES AT SETBACK LINES : The temporary <br /> cut slope shall not exceed one and one half (1 1/2) <br /> horizontal to one (1) vertical . <br /> 1 . FINAL SLOPES: Final slopes shall not exceed two (2) <br /> horizontal to one (1) vertical. A slope stability <br /> analysis shall be prepared that takes into account the <br /> final fill slope is being placed over a cut slope. The <br /> minimum slope stability factors shall comply with <br /> requirements of Development Title Section 9- <br /> 1415 . 3 (k) (4) . <br /> M. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan <br /> shall show the phases of excavation. Reclamation on <br /> the phase of an excavation shall be initiated prior to <br /> the start of the next excavation phase. The final <br /> reclamation of any phase of excavation shall be <br />