My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
PA-0800005
>
SU0006921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:48 AM
Creation date
9/6/2019 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006921
PE
2627
FACILITY_NAME
PA-0800005
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25313019 26
ENTERED_DATE
1/24/2008 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
RECEIVED_DATE
1/11/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\APPL.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH COND.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
730
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m) TIPPING FLOOR AREA: <br /> i) The tipping floor area and solid waste transfer area shall be cleaned daily. Transfer trailers <br /> shall be periodically steam cleaned to remove accumulated grease and dirt. <br /> n) MITIGATION MONITORING PLAN: The applicant shall be required to comply with the <br /> Mitigation Monitoring Program identified as Attachment"A." <br /> i) Any mitigation monitoring done by the Community Development Department shall be done <br /> on a time and materials basis paid for by the applicant. <br /> 2) DEPARTMENT OF PUBLIC WORKS(Staff Contact:Alex Chetley, (209)-468-3023) <br /> a) An encroachment permit shall be required for work within road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> b) The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a <br /> forty-two (42)foot wide right-of-way from the centerline of MacArthur Drive to the property <br /> across the frontage of APN 253-130-26. (A fee based on the current fee schedule is required <br /> for processing the agreement per Development Title Table 9-240.2 as well as a copy of the <br /> most current grant deed of the subject property) (Development Title Section 9-1150.5) <br /> c) The entire route from the project site to Linne Road shall be kept clear of debris on a daily <br /> basis. <br /> d) All of MacArthur Drive(from U.P.R.R.crossing to the south project access driveway)shall be <br /> improved to a traffic index(TI)of 9.5 as approved by Public Works. The reconstruction of <br /> MacArthur Drive south of the Coral Hollow Creek bridge(including the first twenty feet north of <br /> the bridge)shall be completed no later than October 31, 2012. The reconstruction of MacArthur <br /> Drive north of Corral Hollow Creek shall be completed within 12 months of when the average <br /> monthly facility tonnage exceeds 1,000 tons/day. All improvements shall be in conformance <br /> with the current Improvement Standards and Specifications of the County of San Joaquin. <br /> These improvement plans and specifications are subject to plan check,field inspection fees <br /> and must be approved by the County of San Joaquin Department of Public Works. Fees for <br /> plan check and field inspection will be based on the current Public Works fee schedule. <br /> (Development Title Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> e) The frontage improvements for MacArthur Road shall be constructed in conformance with the <br /> standards for one-half of an 84-foot wide right-of-way Rural Arterial Road. The construction of <br /> the frontage improvements will be deferred, upon execution by the owner of a Deferred <br /> Frontage and Roadway Improvement Agreement prior to release of building permit. (A fee <br /> based on the current fee schedule is required for processing the agreement per Development <br /> Title Table 9-240.2 in addition to the submittal of a copy of the subject property grant deed and <br /> an estimate of the proposed improvements. The estimate shall be prepared by a registered <br /> civil engineer with a typical section drawing on a form to be supplied by the Department of <br /> Public Works and submitted to the Department of Public Works for approval. As an option, the <br /> Department of Public Works will prepare the drawing with estimate for an additional fee) <br /> (Development Title Section 9-1150.2[d][41) <br /> f) The applicant shall enter in to an agreement to pay an annual road maintenance fee of$0.06 <br /> per equivalent ton of material entering the site beginning with the issuance of the first building <br /> permit.. The fee is based upon the September 2011 ENR Construction Cost Index of 9,116, <br /> and will be adjusted annually. <br /> Conditions of Approval -4 - PA-0800005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.