Laserfiche WebLink
m) TIPPING FLOOR AREA: <br /> i) The tipping floor area and solid waste transfer area shall be cleaned daily. Transfer trailers <br /> shall be periodically steam cleaned to remove accumulated grease and dirt. <br /> n) MITIGATION MONITORING PLAN: The applicant shall be required to comply with the <br /> Mitigation Monitoring Program identified as Attachment"A." <br /> i) Any mitigation monitoring done by the Community Development Department shall be done <br /> on a time and materials basis paid for by the applicant. <br /> 2) DEPARTMENT OF PUBLIC WORKS(Staff Contact:Alex Chetley, (209)-468-3023) <br /> a) An encroachment permit shall be required for work within road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> b) The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a <br /> forty-two (42)foot wide right-of-way from the centerline of MacArthur Drive to the property <br /> across the frontage of APN 253-130-26. (A fee based on the current fee schedule is required <br /> for processing the agreement per Development Title Table 9-240.2 as well as a copy of the <br /> most current grant deed of the subject property) (Development Title Section 9-1150.5) <br /> c) The entire route from the project site to Linne Road shall be kept clear of debris on a daily <br /> basis. <br /> d) All of MacArthur Drive(from U.P.R.R.crossing to the south project access driveway)shall be <br /> improved to a traffic index(TI)of 9.5 as approved by Public Works. The reconstruction of <br /> MacArthur Drive south of the Coral Hollow Creek bridge(including the first twenty feet north of <br /> the bridge)shall be completed no later than October 31, 2012. The reconstruction of MacArthur <br /> Drive north of Corral Hollow Creek shall be completed within 12 months of when the average <br /> monthly facility tonnage exceeds 1,000 tons/day. All improvements shall be in conformance <br /> with the current Improvement Standards and Specifications of the County of San Joaquin. <br /> These improvement plans and specifications are subject to plan check,field inspection fees <br /> and must be approved by the County of San Joaquin Department of Public Works. Fees for <br /> plan check and field inspection will be based on the current Public Works fee schedule. <br /> (Development Title Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> e) The frontage improvements for MacArthur Road shall be constructed in conformance with the <br /> standards for one-half of an 84-foot wide right-of-way Rural Arterial Road. The construction of <br /> the frontage improvements will be deferred, upon execution by the owner of a Deferred <br /> Frontage and Roadway Improvement Agreement prior to release of building permit. (A fee <br /> based on the current fee schedule is required for processing the agreement per Development <br /> Title Table 9-240.2 in addition to the submittal of a copy of the subject property grant deed and <br /> an estimate of the proposed improvements. The estimate shall be prepared by a registered <br /> civil engineer with a typical section drawing on a form to be supplied by the Department of <br /> Public Works and submitted to the Department of Public Works for approval. As an option, the <br /> Department of Public Works will prepare the drawing with estimate for an additional fee) <br /> (Development Title Section 9-1150.2[d][41) <br /> f) The applicant shall enter in to an agreement to pay an annual road maintenance fee of$0.06 <br /> per equivalent ton of material entering the site beginning with the issuance of the first building <br /> permit.. The fee is based upon the September 2011 ENR Construction Cost Index of 9,116, <br /> and will be adjusted annually. <br /> Conditions of Approval -4 - PA-0800005 <br />